Project Management of International Lighting Company
- Details
- Hits: 7242
ACTION PLAN
Project Background
International Lighting Company is a firm which sells fluorescent lighting tubes to companies across the world. International Lighting Company is particularly proud to offer products from their long Lasting series, which have many good qualities, such as light strength and quality which is far superior to their competitors’ models. International Lighting Company sells products from the Long Lasting series because of their extended lifetime, which considerably increase the periods between renewals. This reduces costs at the same time maintaining the lights’ strength because of the huge savings.
International Lighting Company recommends the use of products from the Long Lasting range, but there are also other good reasons for making this choice. It also offer more in the sense that it is proud of their extensive range of guarantees for the products in the Long Lasting series. One example named by International Lighting Company concerns the two most sold fluorescent tubes, the T5 and T8, both of which carry a guaranteed lifetime of 40 000 hours, considerably longer than other brands can offer. In addition, International Lighting Company guarantee the light strength during the entire 40 000 hours. Here is more about this and the other guarantees of product quality by contacting International Lighting Company.
Project requirements
(Cleland & Ireland, 2008) suggest that during the project design the following development tools will be required for efficient and effective completion of the project implementation in the lifecycle. The table below is a sample of some hardware and software resources that will be needed during the project.
HARDWARE COMPONENT REQUIREMENTS
|
HARDWARE |
EXAMPLES |
ESTIMATED COST |
Computer system |
MAC desktop System |
$5000 |
|
|
Compact Disks (CD) |
$200 |
|
|
STORAGE MEDIA |
Memory cards and hard disks (32GB and 2TB) |
$1000 |
|
Printers |
Hp All in One DeskJet and Epson Printers |
$10000 |
SOFTWARE REQUIREMENTS
|
SOFTWARE |
EXAMPLE |
INITIAL COST |
1 |
operating system |
MAC OSX |
$3000 |
2 |
Application programs |
Mac Applications |
$8000 |
3 |
Antivirus software |
N/A |
N/A |
Project Objectives and Needs
According to (Kumar & Keshan, 2009), the main objective and need of this project is to develop an automated equipment repair and maintenance system for International Lighting company. The specific objectives of this project are:
- To automate equipment repair and maintenance record capturing and storage.
- To enrich data security.
- To augment analysis and reporting.
Expectation of this Project
The project is basically aimed at developing automated equipment repair and maintenance monitoring system at International Lighting Company premise. This will help in the promotion of data integrity and service efficiency to users, management and record sources. According to (Wayembi, 2002), the system would be easy to operate by users and management; both these persons need to be well conversant with the system operability.
(Jung & Lim, 2007) suggest that the system should also be flexible to adapt to the every days changing customer needs. It will also improve the quality of service that will be delivered by the company and cut down the cost and risk of wastage and non-accountability. Through the use of this system stake holders and the management will also have an easy time to monitor activities going on in the company and have the chance to access data and information as authorized by the administrators.
Project Chatter
According to Headman (Kim, 2011), this is the project definition, it is the statement scope, participants, objectives in a project, provides the preliminary role and responsibility and serves a reference of authority for the future project. For example: The scope and Limit
The project focuses on developing automated equipment repair and maintenance monitoring system at the International Lighting Company premise promoting data integrity and service efficiency to users, management and record sources. The system would electronically capture and record equipment repair details of both customers and technician in question. This will as a result deepen data security and amplify analysis and reporting (Headman, 2011). Due to lack of proper technical coordination in almost all the International Lighting Company, the project has not incorporated mechanisms which can be applied in case of such scenarios to solve the problem.
Reasons for the chatter
The reason for undertaking the project, objectives and constraints of the project, direction concerning the solution, identifies the main stake holders and the in-scope and out-scope items in accordance to (Schimdt, 2009)
PROJECT SCHEDULE
PHASE ONE: 3WEEKS TIME: TASKS 1
Setting up of the development environment
The resources being assembled
Requirements specifications
PHASE TWO: 3WEEKS TIME: TASKS 2
Establishing a development team
Assigned of responsibilities to individuals
Data collection is to be done at this phase
PHASE THREE: 3WEEKS TIME: TASKS 3
The design of the project
Testing and coding
Errors are rectified
PHASE FOUR: 3WEEKS TIME: TASKS 4
Approval of the project
co – ordination and communication as well as supervision
Installation
Use of the system
Maintenance
FEASIBILITY PLAN OUTLINE FOR INTERNATIONAL LIGHTING COMPANY
Feasibility study
According to (Acosta, 2004) this is a preliminary investigation concluded to find the validity of a project before it is commenced.
Economic feasibility
According to (Acosta, 2004) this study is conducted to ascertain whether the proposed solution will be economically acceptable for the business view. Financial aspect of the project and the investment to be undertaken will be received in a shorter period.
Technical feasibility
According to (Acosta, 2004) this is conducted to find out whether the organization has the hardware and the software to be used
Social feasibility
According to (Acosta, 2004) this is done to determine the impact of the information system on the society where the society is the users and any other person that may be affected by the system. Due to the research done on the economic, technical and social feasibility, the organization is willing to cooperate positively towards the project and is ready to support where there is need
BUDGET
The table below highlights the estimated budget to be incurred during the project.
TASK |
PLANNED |
COMPLITION |
BCWP |
TASK 1 |
$10000 |
0% |
$0 |
TASK 2 |
$5000 |
50% |
$2500 |
TASK 3 |
$20000 |
75% |
$15000 |
TASK 4 |
$35000 |
|
$17500 |
ACWP =$20,000 |
|||
ACWP/BCWP=1.14 |
From the above Budget unexpected expenses are also included with 14% over the expected Budget
Project approach
Milestone List
According to (Verzuh, 2011), the milestone list defines the intermediate results that must be achieved to get to the final objective. For example generic plan modified, the generic procedures adapted, Training program defined, Training schedule promulgated, Training completed, Validation completed and Project evaluation completed.
Risk Analysis
According to (Craig & Clark, 2012) in this phase the objective is to learn exactly how the current system works and determine how the system will work better to support the organization needs. As (Berkun, 2008), explains, the main task is to gather and record facts about the current system and what is required to improve the current system. Observation and questionnaires will be used to gather data.